PINA DIVING AND ROV SERVICES REFERENCE

BAŞLANGIÇ TARİH Company Project Date
Mar-26 TurkNet İletişim Hizmetleri A.Ş Istanbul Bosphorus Submarine Fiber Optic Passage Preventive Maintenance 2026/1 Mar-26
Feb-26 Exa Infrastructure Turkey Bosphorus Baltalimanı Kanlıca Submarine Cable Crossing Installation Feb-26
Feb-26 Exa Infrastructure Turkey Bosphorus Uskudar Kabataş Submarine Cable Crossing Installation Feb-26
Nov-25 TurkNet İletişim Hizmetleri A.Ş Istanbul Bosphorus Üsküdar, Kanlıca Beach, Cable Displacement and Articulated Protection Pipes repair Nov-25
Oct-25 İBB.Raylı Sistem Modernizasyonu Golden Horn Metro Crossing Bridge Pile and Pile Head Wall Thickness Measurement Oct-25
Sep-25 Metro İstanbul Sanayi ve Ticaret A.Ş. Golden Horn Metro Crossing Bridge Medium Voltage Electrical Cable repair and Underwater fixing operations Sep-25
Aug-25 Fiber Connect Teknoloji Bosphorus Baltalimanı Kanlıca Submarine Cable Crossing Installation Aug-25
Aug-25 TurkNet İletişim Hizmetleri A.Ş Istanbul Bosphorus Submarine Fiber Optic Passage Preventive Maintenance 2025/2 Aug-25
Jul-25 Fiber Connect Teknoloji Bosphorus Uskudar Kabataş Submarine Cable Crossing Installation Jul-25
Jun-25 Metro İstanbul Sanayi ve Ticaret A.Ş. Golden Horn Metro Crossing Bridge 23 Leg Cleaning Project Jun-25
Jan-25 TurkNet İletişim Hizmetleri A.Ş Istanbul Bosphorus Submarine Fiber Optic Passage Preventive Maintenance 2025/1 Jan-25
Dec-24 Fiber Connect Bosphorus Submarine Cable Project between Üsküdar – Kabatas Dec-24
Aug-24 Fiber Connect Bosphorus Submarine Cable Project between Baltalimanı – Kanlıca Aug-24
Jul-24 Deep Offshore Underwater Survey of Adana Ceyhan BOTAS Natural Gas Scaffolding Legs Jul-24
Jun-24 Transport Malta Manoel Island Shipyard Slipway Repair Jun-24
Dec-23 Bezzina Sunken Barge Salvage Operation Dec-23
Nov-23 GLOBAL SYSTEM CONSTRUCTION AND ENGINEEERING SOLUTION LTD. Ras Hanzir Magnetometer survey Nov-23
Sep-23 Osprey Marine Hull Survey Sep-23
Aug-23 Alesta Botaş Marmara Natural Gas Pipeline Rov Control Survey Aug-23
Jun-23 Alesta Botaş Marmara Natural Gas Pipeline Rov Control Survey Jun-23
Jun-23 Excelsis Trench Backfilling Underwater Diving Support Sep-23
Apr-23 GLOBAL SYSTEM CONSTRUCTION AND ENGINEEERING SOLUTION LTD. Ras Hanzir Key Gap Cleanning Apr-23
Apr-23 GP Borg Pinto 4-5 Multi Beam Echo Sounder Survey Apr-23
Mar-23 Excelsis Harel Cable Laying Project May-23
Mar-23 Park Place Akçakoca Akkaaya Pllatform Cllamp Instalation Mar-23
Mar-23 Bezzina Repair to existing Pile nodes at Sliema Ferry Landing Mar-23
Jan-23 GLOBAL SYSTEM CONSTRUCTION AND ENGINEEERING SOLUTION LTD. Construction of a new cargo facility at ras hanzir between laboratory and fuel wharves, corradino, Grand harbour, Malta, hydrographic and oceanographic survey report. Jan-23
Jan-23 GP Borg Construction Of An Extension To Pinto Quays 4 & 5 Including Reconstruction Of Lascaris Wharf, Port Of Valletta, Grand Harbour, Malta, Diving Underwater Support. Jan-23
Oct-22 Huawei PİO NO: 3621105608-1 İZMİT KOCAELI PASSAGE RIGHT OF WAY STUDY
NO: 3621105608-1 İZMİT KOCAELI INVESTMENT FILE PREPARATION FEE
Oct-22
Nov-22 Denar Sakarya Gas Field Development Project Rov Service Nov-22
Jul-22 Excelsis Malta Grand Harbour Fuel Wharf and Bridge Wharf Trench Control Mar-23
Jan-22 Kolin kalyon Joint Venture DP1 1554 Km and DP2 2557 Km. Natural Pipeline installation Project. Mar-22
Apr-21 İlk Construction – Petronas Epcic For The Remaining Scope For Garagol Deniz West Oil Development Project Subsea Fibre Optic Cable Installation Procedure From GTPOGT TO GDDP-A Jul-21
Kas-20 Turknet Intervention to the damaged cable at the Kabataş Beach approach Survey Nov-20
Eki-19 Turknet Kabataş maintenance after Ship anchor tangle to fiber Cable Jul-20
Tem-20 Eti Maden Cooling Water inlet pipeline maintenance May-20
May-20 Eti Maden Roketsan Project ROV Underwater Suppot Nis-20
Nis-20 Denar.Roketsan Arnavutköy Shore Cable Repair Nis-20
Nis-20 Turknet Kabataş Shore Cable Repair Feb-20
Sub-20 Turknet Turgut Kacabas Wreck Recover Project Feb-20
Sub-20 ErGO SİGORTA AŞ. Silivri Marmara Sea Natural Gas Platform ROV Support Project Sep-19
Eyl-19 T.P.A.O. Defence Minister Project May-19
May-19 Roketsan Türknet Baltalimanı-Kanlıca, Üküdar-Çengelköy damage repair works Apr-19
Nis-19 Turknet Dardanel Bridge Construction Sea bottom and Pile Survey  South Side Mar-19
Mart -19 Denar Kabataş Harbour Catodic Protectıon Anod Ins. Pile Control Jan-19
Ocak-19 Makyol Construction Co Dardanel Bridge Construction Sea bottom and Pile Survey Nov-18
Nov-18 Denar Ghana Adowso- Ekyiamenfrom Power and Fibre OpticUnderwater Cable Installation Nov.18
Ekm.18 BOR OPTİK MÜHENDİSLİK AŞ. 2nd Period Bosphorus Crossing Preventive Maintenance Work Jul-18
Jul-18 Türknet Sunken Diving Boat Mermaid Search Operation Found 164m. in Fethiye Jun-18
Jun-18 ERGO SİGORTA AŞ. Burgazada- Yassıada Energy Cable Shore to Shore Survey May.18
Mys.18 GM.Denizcilik Burgazada- Yassıada Energy Cable and BOTAS Natural Gas Pipeline Across Bridge passing installation. Apr-18
Apr-18 Anadolu Elektirik AŞ. Manufacture and Installation of Stainless Steel Grid for Natural Gas Cycle Power Plant Inlet Construction Feb-18
Feb-18 Piri Reis Üniversitesi Maintenance of underwater  fiber optic cable system Feb-18
 Şub.18 Türknet Baltalimanı kanlıca and Arnavutköy line repair works Noc.17
Ara-17 Türknet Seach and Recovery Damaged Fibre Optic Cable, Install and repair with Fibre Joint Unit at Kabataş Nov-17
Nov-17 Türknet Maintenance  Work In The Pipe Of 29 M In The Entrance Of The Pool At The Entrance Of The Natural Gas Cycle Power Plant Water Intake Pipe Sep-17
Eyl.17 Piri Reis Üniversitesi Aug.17
Ağst.17 Türknet BOTAŞ Marmara Sea Natural Gas Pipeline Ambarlı Exit Zone Sea Side Protection Bouy Installation Aug.17
Ağst.17 BOTAŞ Natural Gas Cycle Power Plant Water Intake Structure T Piece 150 m pipeline cleaning work in both directions Jun-17
Jun-17 Piri Reis Üniversitesi Fix Underwater Fibre Optic Cable Fault in Üsküdar Jun-17
Jun-17 Tüknet Preparation of the Deplese and New Location of the Submarine Fiber Optic Cable of Kabatas Pier and Neighborhood Apr-17
Jun-17 İstanbul Üst Yapı İnşaat ve Tic. AŞ Maintenance of underwater  fiber optic cable system Apr-17
Apr-17 Türknet Maintenance of underwater  fiber optic cable system Dec-16
Dec-16 Türknet Vodafone underwater cable permissions Nov-16
Nov-16 Huawei Natural Gas Cycle Power Plant Water Intake and Outlet Structure Underwater Survey Agu.16
Ağst.16 Piri Reis Üniversitesi Natural Gas Cycle Power Plant Water Intake Cleaning Jun-16
Jun-16 Piri Reis Üniversitesi Maintenance of underwater  fiber optic cable system Feb-16
Feb-16 Türknet ROV and Diver Survey for TEİAŞ at Dardanel Bosphorus Dec-15
Dec-15 TEİAŞ Blue Stream Underwater Survey Measurements at Samsun Nov-15
Oct-15 Gas Prom Türk Stream Presurvey before Design Period at Kıyıköy Turkey Sep-15
Aug-15 Denar Ghost Fishnet Recover Project at Prens Island Marmara Sea Aug-15
Jul-15 Tarım ve Köy İşleri Bakanlığı Prens Island Natural Gas Pipe Line Leak ROV Survey in Marmara Sea Jun-15
Jun-15 İGDAŞ Ghost Fishnet Recover Project at Prens Island Marmara Sea May-14
May-14 Tarım ve Köy İşleri Bakanlığı Izmit Bay Osman Gazi Bridge Construction Ceason Touchdown Survey with ROV Mar-14
Mar-14 STFA Prens Island Natural Gas Pipe Line Leak ROV Survey in Marmara Sea Sep-13
Sep-13 İGDAŞ Golden Horn underwater Fibre Optic Cable Installation Sep-13
Sep-13 Turknet Prens Island Natural Gas Pipe Line ROV Survey in Marmara Sea Sep-13
Sep-13 İGDAŞ Izmit Bay Osman Gazi Bridge Construction Search and Recover Anchor and Chain (ROV) Aug-13
Aug-13 ARAS Izmit Bay Osman Gazi Bridge Construction Search and Recover Concerete Blocks (ROV) Aug-13
Aug-13 Körfez Denizcilik Izmit Bay Osman Gazi Bridge Construction seach Pipe (ROV) and Cut with Diver Jul-13
Jul-13 STFA Izmit Bay Osman Gazi Bridge Construction Pile Survey Jul-13
Jul-13 STFA Vodafone Izmit Bay underwater Fibre Optic Cable Installation Jan-13
Jan-13 Vodafone Vodafone Dardanel underwater Fibre Optic Cable Installation Dec-12
Dec-12 Vodafone Istanbul Bosphorus 3 times cable crossing Oct-12
Oct-12 Turknet Marmara Sea and May-13
Jul-12 BOTAŞ Golden Horn underwater Fibre Optic Cable Survey and maintenance Oct-11
Sep-11 Türk Telekom İstanbul Bosphorus Fibre Optic cable crossing Üsküdar Kabataş Apr-11
Apr-11 VODAFONE Natural Gas Pipeline Control Maintenance and Research Tests. Taking a sample piece from the pipeline and placing a new part instead Mar-10
Mar-10 İGDAŞ Underwater Survey with Diver and ROV Jan-09
Jan-09 ASELSAN North Marmara Natural Gas Platform NDT Survey Cleaning (300m3 mussels). 4 Cleaning the buoy survey Dec-08
Nov-08 TPAO MCW Return line internal and external (500mt.) MCW arrival line survey and cleaning. Buoy survey cleaning chain change. Nov-08
Nov-08 UNİMAR Repair of the gas pipe between Dragos and Büyükada, replacement of 2 pieces of 12-15 meters and survey Jul-08
Jul-08 İGDAŞ-İSTANBUL GAZ D / FO cable 2800 meters between Darıca-Yalova and a total of 1650 meters between Üsküdar Kabataş and Kanlıca-Baltalimanı. May-08
May-08 MEMOREX Protecting the connection points on theAyazlı Pipeline with specially designed concrete blocks and covering them with sand bags (depth between 50-85 meters) May-08
Apr-08 T.P.A.O. Sarayburnu-Salacak 4-line submarine cable installation. Mar-08
Mar-08 DETEK On the Platform side of the Natural Gas Pipeline, which goes from the existing Natural Gas Production Platform in Ayazlı in Akçakoca / Black Sea region to the Natural Gas Production Facilities on the coast, 50 mt. Dismantling, repairing and reassembling of the defective part in the depth with Derinsu Mixed Gas dives. Feb-08
Jan-08 T.P.A.O. 70 mt on the Platform side of the Natural Gas Pipeline that goes from the existing Natural Gas Production Platform in Ayazlı in Akçakoca / Karadeniz region to the Natural Gas Production Facilities on the coast. Dismantling, repairing and reassembling of the defective part in the depth with Derinsu Mixed Gas dives. Sep-07
Jul-07 T.P.A.O. Karabiga / Şarköy in the region, “Turkey – Greece Natural Gas Pipeline – Phase 2” of the scope of submarine fiber optic cable plant, laying on the seabed and making the ultimate test. Jul-07
Apr-07 ÖZTAŞ – PEKER İŞ ORTAKLIĞI Ayazlı in the Akçakoca / Black Sea region, 1,500 mt from Çayağzı Sahil Gas Production facilities. Construction, installation, burial and final testing of the long and 6 ”diameter Discharge Pipeline. Aug-07
Apr-07 TOREADOR TÜRKİYE LİMİTED Derinsu Mixed Gas Dives, Companion Services, Survey Services during the laying of 8600 + 3200 = 11800 mt., Ø 12 ”Natural Gas Pipeline between the Natural Gas Production Platforms and the Natural Gas Production Station on the coast, belonging to TPAO and TOREADOR TURKEY LIMITED, in Akçakoca / Black Sea region, Opening of Land and Sea channels and burying the pipe.Support to the SAT system Jan-07
Sep-06 VALENTINE MARITINE (GULF)LTD Control, maintenance and calibration of DF / O Cable and Termination (Hydrophone and Amplifier) station. Aug-06
Aug-06 SAVTEKSAN SAVUNMA TEKNOLOJİSİ AŞ. Hull Control, Cleaning and Video Surveys of Naval Ships within the ISTANBUL SHIPYARD COMMAND. Aug-06
Aug-06 SAVUNMA Akçakoca / Kdz. In the region, 60-71 mt. Derinsu Mixed Gas Dives for Control, Video Recording and Template Installation on the Natural Gas Drilling Platform in the depth line Jul-06
Jul-06 TOREADOR TÜRKİYE LİMİTED Video survey, mussel cleaning and periodic maintenance of MCV and Outlet pipelines and Siphone Pit. (Sultanköy / Marmara Ereğli) May-06
May-06 UNİMAR ENERJİ YATIRIM A.Ş. Açakoca / Kdz. In the region, 62 mt. Derinsu Mixed Gas Dives for Control, Video Recording and Template Installation on the Natural Gas Drilling Platform in the depth line May-06
May-06 TOREADOR TÜRKİYE LİMİTED Açakoca/Kdz. region, 62 mt. deep sea mix gas dives for template placement and video surveillance May-06